| Sign In | Join Free | My infospaceinc.com |
|
Brand Name : WKS
Certification : ROHS
Place of Origin : Hebei,China
MOQ : 50 piece
Price : US $55.00 - 70.00/ Square Meter
Payment Terms : T/T
Supply Ability : 1000 piece in 10 days
Delivery Time : 10-30 workday
Packaging Details : Bundled / Tied in bundles/Optimization of container loading
Product name : Reusable Formwork System
Color : black / white
Product Life : More than 1500 times
Loadcapacity : Supports up to 30 kN/m²
Surfacefinish : Smooth concrete surface finish
Size : 150*30*(8-10)cm
Material : High-density polypropylene (HDPE)
Panelsize : Standard sizes such as 600mm x 600mm or customizable
Reusability : Reusable up to 100+ times
Final Product : Wall
PP Plastic Formwork is a versatile and cost-effective construction solution designed for high-efficiency concrete forming. Made from durable polypropylene, it serves as a reliable, reusable alternative to traditional wood and steel formwork, ideal for residential buildings, commercial structures, and general civil engineering projects requiring smooth concrete finishes.
| Production | Material | Size (mm) | Unit Weight (kg/pcs) | Area (m²/pcs) |
|---|---|---|---|---|
| PP Panel | PP | 1500*1200*78 | 27.00 | 1.8000 |
| 1500*1000*78 | 22.50 | 1.5000 | ||
| 1500*900*78 | 20.25 | 1.3500 | ||
| 1500*800*78 | 18.00 | 1.2000 | ||
| 1500*700*78 | 15.75 | 1.0500 | ||
| 1500*600*78 | 13.50 | 0.9000 | ||
| 1500*500*78 | 11.25 | 0.7500 | ||
| 1500*450*78 | 10.13 | 0.6750 | ||
| 1500*400*78 | 9.00 | 0.6000 | ||
| 1500*350*78 | 7.88 | 0.5250 | ||
| PP Panel | PP | 750*150*78 | 2.25 | 0.1125 |
| 750*100*78 | 1.50 | 0.0750 | ||
| 600*600*78 | 6.84 | 0.3600 | ||
| 600*500*78 | 5.70 | 0.3000 | ||
| 500*500*78 | 4.75 | 0.2500 | ||
| 500*400*78 | 3.80 | 0.2000 | ||
| 400*400*78 | 3.04 | 0.1600 | ||
| 300*300*78 | 1.71 | 0.0900 | ||
| 250*250*78 | 1.19 | 0.0625 | ||
| 200*200*78 | 0.76 | 0.0400 | ||
| 150*150*78 | 0.43 | 0.0225 |
Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company.
Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 20 years.
If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials.
If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan.
Generally, it takes about 5-8 days to complete the specific plan and detailed quotation.
Yes, we can provide samples. You will need to pay for the shipping cost.
According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.
If the construction environment where the project is located belongs to long-term high temperature, the increase in temperature of the concrete pouring project may cause slight deformation of the formwork. It is recommended to use all aluminum alloy formwork or steel frame wood formwork system in high temperature areas.
The load force is too small to complete the construction of large-sized concrete structures; Poor high temperature resistance, slight deformation may occur when used in high-temperature areas.
Payment ≤ 1,000 USD: 100% in advance
Payment ≥ 10,000 USD: 30% T/T in advance, balance before shipment
Or L/C (Letter of Credit)

|
|
Interlocking Reusable Formwork System Eco Friendly Plastic Shuttering Sheets Images |